1                    Introduction

1.1            Overview of the System

<Describe the overview of the application>

1.2       Purpose

<The purpose of this Test Plan is to clearly describe the various testing techniques and testing approaches followed for testing the system>

1.3       Acronyms and Abbreviations

<This subsection provide the definitions of all terms, acronyms and abbreviations required to properly interpret the Test Plan document>

2          Test Level

<Mention the applicable levels of testing – Unit, integration, system, acceptance and final acceptance. Describe a short description on how they are to be administered and if few are not applicable state why they are not available>

2.1       Test Level – Entry and Exit

Entry LevelTest LevelExit Level
1. Functional Spec reviewed and available.   2. System Test Cases reviewed and ready.  System TestingSystem test cases 100% executed.   No severity ‘Fatal’ or ‘High’ problem outstanding.   Test results documented in TPR.
   

Table 1 : Test Level – Entry and Exit

2.2       Test Levels and Test Items

Test LevelTest Items (Test Procedure, Test Cases, Scripts Reference)Tools used (if any)Coverage
System TestingSystem Test casesManualAs per the Requirement Specification

Table 2 : Test Levels and Test Items

2.3            Exclusions

<No exclusions. The entire functionality as defined in the Requirement Specifications document shall be tested>

2.4       Test Criteria

2.4.1         Item Pass / Fail Criteria

<When the Expected Result matches with the Actual Result the corresponding Test Case is marked as ‘Pass’. Otherwise, the Test Case is marked as ‘Fail’. Test Problem Report (TPR) for failed test cases will be raised with a brief description of steps that actually lead to the issue. The Test Case ID is marked in the TPR against the Issue Description for better understanding. All issues in TPR shall be tracked to closure.>

2.4.2         Suspension and Resumption Criteria

<When 40% of executed test cases fail then testing would be suspended & the application would be returned to the development team for rework. Also testing would be suspended when the basic functionality is not met.

Testing would be resumed when the raised issues are fixed by the development team.>

2.4.3         Regression / Verification Criteria

< If the failed test cases percentage in more than 40% then regression testing would be performed else undergoes a verification cycle.>

2.5       Constraints and Deficiencies

< Inadequate time for Testing, Testing environment not available in time, Tester not familiar with the system, Delay in Receiving baseline documents, Delay in receiving the fixes from Development Team, Poor System Performance/response>

3          Test Reporting and Defect Tracking

<All defect raised during testing would be logged in an excel sheet>

4          Change Management

<Changes happen in the form of a requirement change or design change. Test plan and other test artifacts are analyzed for the impact due to change. Changes are then appropriately carried out and go through the same workflow as preparation, review, verification and baseline. Traceability matrix is revisited to accommodate the changes>

5          Test Planning

5.1       Roles and Responsibilities

RoleResponsibilityPerson
Test LeadPreparation of Test plan, Review of Test Cases, Testing, Test Monitoring and Test Consolidation and Analysis 
TesterPreparation of Test Cases, Testing Defect Reporting 

Table 3 : Roles and Responsibilities

5.2       Test Schedule

TaskStart DateEnd DateResourceDeliverable
Test case Preparation<dd Month yyyy><dd Month yyyy><Name>Test cases
Testing<dd Month yyyy><dd Month yyyy><Name>Test Problem report Test Summary Report

Table 4 : Test Schedule

<The above could be linked to the overall Project Schedule>

5.3       Environment Needs

5.3.1         Hardware

S. NoTesting TaskHardware DetailsNeeded on or before
    
    

Table 5 : Hardware Details

5.3.2         Software

S. NoTesting TaskSoftware DetailsNeeded on or before
    
    

Table 6 : Software Details

5.4       Training Needs

< Give the training details to the Testing team. Could be specific to domain, technology and test tools >

S. NoTraining DescriptionNeeded on or before
   
   
   

Table 7 : Training Needs

5.5       Risk and Contingencies

S. NoRiskMitigationContingency
    
    

Table 8 : Risk and Contingencies

6          Customer Validation Plan

<Mention the steps taken for validating at the customer end. This would be UAT, FAT or intermediate testing or parallel testing. This section needs to indicate the various types of validations planned, validating components and the schedule>

6.1       Roles and Responsibilities

<State the various roles and their responsibilities here in this section. This could be in overall sync with the PMP roles and responsibilities >

Role (Customer end and COMPANYNAME)ResponsibilityPerson
   
   
   

Table 9 : Customer Roles and Responsibilities

6.2       Validation Schedule

<Give the complete validation schedule and this has to be part of the overall project schedule>

Validation Item <Build or Prototype or Component inclusive of iteration>Start DateEnd DateEntry CriteriaExit Criteria
     
     
     

Table 10 : Validation Schedule

* The above could be linked to the overall Project schedule

6.3       Validation Environment Needs

< Give the testing hardware/software environmental details here. This is inclusive of all test levels, techniques and in terms of hardware and software. Also mention the location where the validation would be done >

6.3.1         Hardware

S. NoHardware DetailsNeeded on or before
   
   
   

Table 11 : Validation Hardware Details

6.3.2         Software

S. NoSoftware DetailsNeeded on or before
   
   
   

Table 12 : Validation Software Details

6.4       Validation Items

<Mention what are the items that have to be used for validation. These would be scenarios or scenario test cases or some cases written and given by customer. Mention what would be the validation items customer would use>

6.5       Reporting and Tracking to Closure

<Mention how customer validation results would be reported – either in TPR or customer given format and also mention how they will be tracked to closure>